110 kV Transmission Line Feasibility — 137.5 km
All projects
Power · 07

110 kV Transmission Line Feasibility — 137.5 km

Feasibility study and preliminary engineering for a 137.5 km 110 kV double-circuit transmission line strengthening the national grid backbone, financed by AfDB.

Client

IBC Group / EDCL / AfDB

Location

Multi-province network, Rwanda

Year

Delivered

Status

Certified Complete

Scope of Services

  • 01Route selection and corridor optimisation
  • 02Load-flow and short-circuit studies
  • 03Tower spotting and structural sizing
  • 04ESIA and RAP framework
  • 05CAPEX & financial modelling

Outcomes

  • Validated alignment minimising resettlement
  • Bankable feasibility delivered
  • Certificate of Good Completion received