110 kV Transmission Line Feasibility — 137.5 km
Feasibility study and preliminary engineering for a 137.5 km 110 kV double-circuit transmission line strengthening the national grid backbone, financed by AfDB.
Client
IBC Group / EDCL / AfDB
Location
Multi-province network, Rwanda
Year
Delivered
Status
Certified Complete
Scope of Services
- 01Route selection and corridor optimisation
- 02Load-flow and short-circuit studies
- 03Tower spotting and structural sizing
- 04ESIA and RAP framework
- 05CAPEX & financial modelling
Outcomes
- Validated alignment minimising resettlement
- Bankable feasibility delivered
- Certificate of Good Completion received
Next Project
Methane Gas-to-Power — Lake Kivu
Browse other projects
Select another project to review

Petroleum · 01
OILCOM Fuel Depot Expansion — Jabana
OILCOM Rwanda Ltd · 2025 — Ongoing

Regulatory · 02
National Fuel Marking Scheme Feasibility
Ministry of Trade and Industry (MINICOM) · 2025

LPG · 03
17,100 m³ LPG Storage & Bottling Plant — Rusororo
Private Investor · Ongoing

Strategy · 04
National LPG Supply & Distribution Strategy
Ministry of Trade and Industry (MINICOM) · 2021

LPG · 05
LPG Filling Facility — Lake Petroleum, Kamonyi
Lake Petroleum Ltd · Delivered

Petroleum · 06
60 Million-Litre Fuel Depot — Rusororo
Government of Rwanda · Delivered

Renewables · 08
Methane Gas-to-Power — Lake Kivu
Magma Energies Ltd · Delivered

Petroleum · 09
Refurbishment of Rwabuye Fuel Depot
Government of Rwanda · Delivered